Steel Fabrication
Bridge Fabrication Drawings
Installed bridge project supported by a proper fabrication drawing package so the finished steelwork and the issued detail can be checked against the same job.
What came in
- Bridge layout requirements
- Fabrication scope
- Installation reference photos
What was prepared
- Bridge fabrication drawings
- Installed steelwork reference
- Workshop-ready drawing pack
Project notes
Challenge
The bridge needed to be documented clearly enough for fabrication while still tying back to the finished installation on site.
Clarke CAD scope
Clarke CAD supported the job with a proper fabrication drawing package covering the bridge steelwork, then matched that work to the installed result shown on site.
Deliverables
- Fabrication drawing package for the bridge steelwork
- Installed bridge reference image
- Drawing information suitable for workshop review and issue control
Outcome
The project links the built bridge back to a clear drawing package, pairing the installed result with the supporting fabrication information.